Freshwater diversion. By definition, freshwater diversion is simply diverting the flow of freshwater into a desired area. The purpose may be simply to place more water in the chosen site or, most commonly in southern Louisiana, to use freshwater to push salt water back, thus diversifying existing wetlands. There are three types of diversion projects: controlled diversions, siphons, and small-scale diversions.
i. Controlled Diversions. First suggested in 1973, controlled freshwater diversions would allow Mississippi River water (and some sediments and nutrients) to flow into the marsh through concrete structures built in the levee.
The advantage provided is that the freshwater pushes back intruded saltwater and introduces some sediment and many nutrients. These are controlled by the construction of large, concrete structures that allow the flow of river water to be regulated.
The U.S. Army Corps of Engineers has identified, and Congress has authorized, three places for diversions:
A. Caernarvon Freshwater Diversion - Located on the east bank of the Mississippi River south of New Orleans, this is the site of the first diversion structure that was completed in 1991. It transports river water into Big Mar. This structure has a maximum flow rate of 8,000 cfs and may produce 16,000 ac (25 sq mi) of renewed marsh.
B. Davis PondFreshwater Diversion - This structure,opened since 2001, is located on the west bank of the river above New Orleans near Edgard. It provides freshwater into the Barataria Basin via Lakes Cataouatche and Salvador. This structure has a maximum flow rate of 10,650 cfs and produces 83,000 ac (130 sq mi) of renewed marsh.


ii. Bonnet CarréFreshwater Diversion - This is the most controversial structure being discussed. There will be much discussion before this project is implemented, with most of the controversy centering on whether we want to risk potential contamination of the resources of Lake Pontchartrain, into which it will introduce river water. If installed, the present location planned for use is the north side of the spillway inside the existing guide levees. This structure is projected to have a maximum flow rate of 30,000 cfs and to produce some 10,000 ac (16 sq mi) of renewed marsh.

The best solution will be to divert river water through the LaBranche Wetlands, that vast marsh area one drives across on the I-10 when leaving Kenner for Baton Rouge. This would enrich those wetlands (they are too salty) and filter to pollutants from the water.

LaBranche Wetlands, looking toward Lake Pontchartrain, September 2003
Purpose: To move freshwater into marshes that are becoming salty due to saltwater intrusion. The diverted water will convert the nearest marshes back to freshwater habitats, thus increasing diversity of the existing marsh.
Note : These diversions are designed to move water, not sediment. Over the diversions' projected 50 year life, they will create the amounts of renewed marsh that are mentioned above (a total of 109,000 ac, which is equal to 171 sq mi, or 3.42 sq mi/yr). In order to have progress, large scale diversions (10 times the size of those listed above) of both water and sediment should be constructed.
b. Siphons . These are relatively small diversions that take place by siphoning water from the river over the levee through pipes. There are many now in operation, but one of the best known is the Violet (LA) siphon. This siphon consists of two large pipes that can move a maximum of 250 cfs. Its purpose is to rediversify a marsh in St. Bernard Parish.
The following photos are of the White-ditch Siphons on LA 39 (east side of the Mississippi River) in Plaquemines Parish:

Water is sucked up from the river.

Water is siphoned in pipes over the levee.

Water is flushed into a canal and delivered into the marsh.
c. Small-scale diversions . In recent years, there have been many smaller projects whereby small crevasses have been constructed to allow splay development. These differ from the other two types of diversions in that they are uncontrolled (no large structure) and are usually very small. They appear to be working well.

In fact, virtually any place an opening in a levee occurs (called a crevasse), a mini-delta begins to form. This photo was taken along a canal near Venice, LA. It shows a progression of delta development at three crevasses:

d. Larger-scale diversions. Many people believe that we should open numerous simple crevasses in the levees south of New Orleans. Though this may sound so easy that it would have little effect, it actually could help a lot. Back in the 1860s, a family by the name of Cubit created such an opening in the levee where Pilot Town is located today. This opening, called Cubit's Gap, now carries about 10% of the total flow of the Mississippi River and has created the Delta National Wildlife Refuge. There are two stories about how this opening came to be, but both attribute it to the Cubit family. The first is that, as Mr. Cubit became older, he had trouble pulling his pirogue over the natural levee when he went fishing and muskrat trapping. One day he took his shovel and made a shallow opening and, bingo, the river took over! The other version is that each day the Cubit daughters had to go get the cows at the end of the day. The cows roamed farther and farther down the levee, so one day the girls took a shovel and cut a trench across the levee so the cows would go no farther. The rest is history. Regardless of which story is true, it shows how the river can take advantage of a little help and how rich the resulting wetlands can be.

The large opening on the left side of the river is Cubit’s Gap. The three distributary split in the upper center is Head of Passes, with Southwest Pass (the one used for commercial shipping) heading to the right. Photo taken facing south, hence Cubit’s Gap is on the east side and Southwest Pass flows to the southwest (isn’t that convenient?).
There are many such stories in south Louisiana. Coupe a Bel was a cut made in the barrier island just east of Grand Terre by a Mr. Bel. Craque a Methune is located on the Lafourche/Jefferson boundry and was allegedly formed when a little girl dug a trench with her spoon.
In late 2003, the USACOE launched a new larger-scale diversion on the west bank of the Mississippi River south of Venice (just north of Cubits Gap). It is a ditch, dug at an angle to the northwest with hopes that this angle will prevent the river from totally following that pathway, thus causing problems for Southwest Pass. This project’s purpose is to ultimately build 10,000 acres of marsh in an area that has become open water. If this is successful, other such project will certainly follow.
 
Louisiana 's wetland loss is too important to simply stop at three controlled diversions.
---Potential problems: As long as large projects are considered the solution, they will take forever to complete. The following illustration shows the time span of typical Corps of Engineers projects:

Human economic activities will be displaced. This will hurt in the short term, but be very beneficial in the long. Some human population centers may be displaced or will require individual flood protection levees.
Two questions should be asked: 1) Will the diversion affect water quality? 2) Will it mimic Mother Nature?
A serious issue in the early 1990s, and occasionally recurring, is the impact of diversions on the oyster industry. The best and most productive oyster reefs develop within relatively narrow salinity ranges. They expand slowly over years under stable conditions. If one suddenly allows freshwater to flow over them, they die and the oystermen lose their livelihoods. If we are to create new diversions to offset the impacts of coastal erosion, then we should develop a plan to provide for the oystermen. We will address that issue later.
- Rerouting the mouth of the Mississippi River . A novel concept was discussed by the late Dr. Joe Martinez (1986) wherein he suggested that the Mississippi River be diverted south of New Orleans (immediately south of Chalmette) onto the continental shelf through St. Bernard Parish.

This will solve two problems:
A. It will begin to place river borne sediments on the shelf in Breton Sound and hopefully fill it in to the Chandeleur Islands. This can rebuild many, many square miles of coastal wetlands.
B. It will push the salt water back that is entering the MRGO. This will affect the following:
a. Stop the negative impact of salt on the non-salt marsh.
b. Stop tidal activity from stripping the marsh of its organic detritus and soils.
c. Stop salt water from entering Lake Pontchartrain through the Seabrook area.
d. It will allow the marshes of St. Bernard Parish to rediversify since there will be gradients of salinity present.
There are many economic advantages, too. Shipping would be facilitated since the route up river would be shorter. Dredging would be less expensive because of shorter distances plus more efficient hydrolics due to river flow speeds. Expensive programs to stabilize bank erosion may become obsolete. This should help potential flooding of New Orleans because it will afford less resistance for water flowing past the city.
During 1998, the Port of New Orleans came to the realization that things are changing and that they must begin planning for the distant future. Discussion and study has begun to consider moving the port (especially for containerized shipping) nearer the present mouth of the Mississippi. Site mentioned include Venice and Port Fourchon. Such a decision would include the potential for a new channel for the Mississippi River.
---Potential problems: Initial financial cost would be very high. Present landowners and users will be affected. The politics of doing something of this magnitude (and sanity) would be monumental. We must pray for elected officials who possess intellectual honesty and political courage!
- Atchafalaya River system . During the last 60 yr, about 50 sq mi of lakes and backwaters within the Atchafalaya River Basin have naturally filled in with sediment. Over the last 16 yr, 48,000 ac (75 sq mi) (as of 1989) of new deltaic marsh have developed at its mouth.

This is the only area on Louisiana's coast where significant increases have occurred in the last 40 yr.
The U.S. Army Corps of Engineers predicts that a maximum of 200,000 ac (312 sq mi) will be produced by the Atchafalaya River System.
---Potential problems: Present water uses will change. This has already occurred with the filling in of Grand and Six Mile lakes.
4. Increasing the flow of the Atchafalaya River. At present, of all the water flowing down the Mississippi, Red, and Ouachita rivers, 30% normally flows through the Atchafalaya River and 70% down the Mississippi River. Some propose increasing the Atchafalaya River's flow to promote delta building in Atchafalaya Bay. U.S. Army Corps of Engineers says that their models tell them that the 70%/30% split is the most efficient and should not be changed.

---Potential problems: Population relocation may be required. In communities such as Morgan City, much investment in current water handling systems will have to be abandoned.
5. Control of canals and channelization projects. First of all, it is now very difficult to acquire a permit to construct a new channel in the coastal wetlands. At one time, it was done with reckless abandon.
There is constant discussion about back-filling existing canals. Though this seems perfectly logical and common-sense indicates that it must happen, there are difficulties. Much of the soil in our coastal marshes is extremely high in peat content and, once it is removed by a dredge bucket, it pours like liquid. It does not stack nicely on the bank so that it can later be moved back into the channel. When the soil type allows backfilling, however, the process should be done and frequently is today.
When it cannot be done, even with existing canals and channels, an investigation should be done regarding the merits of plugging existing canals, thus stopping 1) further saltwater intrusion and 2) boat traffic whose wakes erode the banks. A plugged canal may eventually become shallower, or even fill in all the way, due to less water movement allowing sediments to settle out. Recent studies have shown that these two events do not always occur. Scientists are trying to find out why.
---Potential problems: Very costly. Back-fill materials for old canals are not readily available.
6. Dredging. In the past, sediment dredged from the bottom was either lost (e.g., over the edge of the continental shelf) or randomly dumped by hopper dredges. The new philosophy is to place the valuable sediments where they will best restore wetlands. To do this, the dredging industry introduced suction dredges, which operate by sucking up the sediment like a vacuum cleaner and sending it through a floating pipeline until it exits in the desired location. When that place is finished, the operators simply move the end of the pipe to a new place.

Note how shallow the water is getting at the top right of the photo.

The Corps of Engineers placed a stone wall along the edge of the river, then filled in behind it.
Also, see the discussion of spray dredging below.
---Potential problems: This type of dredging is very costly, but it appears that the final product is worth the expense.
7. Spoil bank solutions. Again, there are today more strenuous regulations regarding producing new spoil banks. In 1988, new spoil banks amounted to only 0.5% of all preexisting spoil banks. This is a good trend.
In many areas, direct removal of spoil banks is occurring.
Making cuts in spoil banks may often help restore the region's natural hydrology.
Spray dredging should be encouraged. This technique requires a special type of dredge that removes the soil and sprays it over the adjacent marsh up to 300 ft away, eliminating the production of spoil banks by bucket dredges while at the same time adding to the soil content of the marsh.


Another solution, pioneered by the Corps of Engineers in the LaBranche Wetlands, is to build levees that are designed to eventually fail. In the LaBranche Wetlands, the Corps built levees and filled the newly formed "bowl" with soil pumped in from the bottom of the adjacent Lake Pontchartrain. They then planted marsh grasses. In fulfillment of the plan, after the marsh grasses became established, the levees began to collapse, thus uniting the newly formed marsh with the tidal flow of the lake.
---Potential problems: Most of this is a "new" cost that may be passed on to consumers (remember the importance of attitude adjustment). Long range impacts of spray dredging are unknown.
8. Directional drilling. Directional drilling should be encouraged from open water so that wetlands are not directly impacted. Using this technique, fewer channels need to be dredged. This is very widely used in the oil and gas industry today and is considered standard operating procedure.



---Potential problems: This is a very expensive (short term) activity and the cost will ultimately be borne by the public.
9. Air-cushioned vehicles (ACVs, or hovercraft) and air boats. On the Northern Slope of Alaska, ACVs have been used to move equipment for drilling operations, thus causing minimal impact on the delicate tundra. Studies have shown that ACVs could be used in our coastal wetlands, reducing the need to dig so many canals. They may be especially good for seismographic work. In fact, these are manufactured in New Orleans by Textron Marine and Shell Oil has been using an ACV crew boat for several years at the mouth of the river.

Courtesy Hoover-Freight International, L.L.C.
Courtesy Hoover-Freight International, L.L.C.

Drilling in 1-4 ft (Hoover-Freight International, L.L.C.)
Air boats, flat boats driven by airplane engines and propellers, have recently (1990) been used for a seismic operation near Port Sulphur by LL&E. They used single engine boats to set up their transects. Then they used a monstrous flat boat with four airplane engines to carry the derrick needed to drill holes into which the explosive charges were placed. All other movement about the site used the typical single engine boats. After the job was done, there was not a trace that this major operation had occurred. This is much different from standard seismic operations that used tracked swamp buggies that leave deep scars in the marsh that eventually turn into puddles, then ponds, then lakes!


---Potential problems: Will ACV and air boat use really be non-destructive to the marsh? If wide-spread use occurs, regulations will be needed to prevent wide-ranging travel over the marsh with potentially unresearched, long range negative impacts.
- Sediment trapping . Where water flows and there is ample sediment, the moving water tends to pick up and transport the sediment. As we have discussed, in the past the moving river simply moved sediment to other areas of the coastal wetlands and deposited it. Today, most of it moves into the Gulf of Mexico and is “lost” to coastal restoration. Several devices have been used to trap the sediment, either by a) stopping it as it moves along (like a strainer), and b) causing the water to slow or stop so that the sediment can settle out.
- Terraces: In southwest Louisiana, the Department of Natural Resources has constructed square walls of rocks, with gaps at the angles. The concept is that water will flow in (by currents or tidal activity), lose its motion, and drop its sediment load before leaving. Note the huge scale (see the relative size of the working backhoe).

B. In the 1950s and before, the Dutch used dikes to hold back the seas from their low lands. Here is a photo taken in 1958 – North Sea to the left and the Zuider Zee to the right.

For the last several of decades, the Dutch have used a system of fences in the Wadden Zee that have created marshes that protect their dike and increase productivity in nearby waters.
The system is simple:
A. Fences of limbs are constructed with openings that allow sediment-laden water to enter.
B. As the tide changes, sediment in the water settles against the fence, thus building up the bottom. Another way the fences work is that their mere presence stabilizes the water around them causing sediment to settle out.


In Louisiana, projects in the LaBranche Wetlands of St. Charles Parish and in Pass a Loutre Wildlife Management Area at the mouth of the Mississippi River are having positive effects.
The LaBranche Wetlands project takes advantage of sediments that are blown into the marsh during storms or that wash in during the relatively small tidal changes. Also, some comes from organics produced in the marsh itself. This is a test site being studied by scientists from LSU. They initially made their fences by driving posts into the marsh floor, cutting branches from nearby forests of blackwillow and tallow, and weaving these branches among the posts. This was very labor intensive and had to be done during the winter when water was low, leaves were off the trees, and the majority of the sediment was in the marsh. Several configurations were tried (of the test fences, all were between the I-10 and the lake between Kenner and the Bonnet Carre spillway):
-several parallel fences (this can be seen from the I-10 at mile marker 215).

-V-shaped fences.

-X-shaped fences.

An improvement came when it was decided to use Christmas trees. Allen Engsminger and I were having coffee in the LSU Union with John Day, the scientist who had brought the sedimentation fence technology to the United States from the Netherlands. Dr. Day was discussing how tiring it is to use woven willow branches, and someone said that it would be great to use Christmas trees that could be handled easily and would function well. Dr. Day acknowledged that it is a great idea, but that he could never get the trees. I said that the collection of trees is something the Louisiana Nature Center could do easily. Soon, there was a plan in place to have citizens of Orleans and St. Charles parishes donate trees. The next year, American Waste played a major role collecting thousands of trees that would be transported to the research site by the Louisiana Department of Natural Resources, and put in place by Dr. Day and his students.
The advantage to the sedimentation project is that A) the Christmas trees are readily available during the winter, B) each one is very dense (as opposed to moving many willow branches to equal the same sediment capturing capability), C) the trees are easy to handle. The way the plan was implemented was relatively simple. Two parallel rows of posts were placed in the marsh. These were surrounded by hog-wire, forming a container that was then filled with trees. Wire was placed over the top to prevent the trees from washing out during storms. It now appears that this is a successful project.


A new approach, first used in 1992 in Jefferson Parish, is to use Christmas trees to fill in existing canals and well sites (key holes).
---Potential problems: Scientists should monitor these projects to see if the change in location of sediment impacts the adjacent waterways.
11. Barrier island and beach projects. High, stable dunes protect beaches and marshes. Louisiana, however, has no large dunes due to 1) the relatively high rainfall (about 65 in/yr) that keeps the sand too wet and 2) a high content of ground mollusk shells that are much heavier than sand. The nearest high dunes are found in drier areas that contain pure silicate sands like Padre Island, TX, to the south, and Horn Island, MS, to the east.
A. Construction or reconstruction – For years and years, we tried to stabilize our barrier islands using hard engineering (see “causes” section above). In our human memory, we knew the islands as low, sparsely vegetated zones that were always subject to the whims of the sea. Dr. Shea Penland looked at the historical geology of the barrier islands and learned that they once where much higher and heavily vegetated, much like Horn Island (off Biloxi, MS) is today. The new “managed” barrier islands may be more stable over time.

In Terrebonne Parish, there are two excellent, successful examples of how barrier islands can be reconstructed or can be stabilized (for a period of time!) via leveeing techniques.
Wine Island (formerly called Vine Island) was located near the mouth of the Houma Navigation Canal. The Parish implemented a plan whereby a ring of stones was placed where Wine Island used to be and dredge material was placed inside. Now there is an island again.

Wine Island after restoration.
On East Island (the eastern-most piece of the former Isle Dernier), a huge levee was built and filled in to a height of some six feet above sea level. It was then planted with many species of naturally occurring plants. This project has stabilized East Island for the next 10 years or so.
A similar project was established on Fouchon Beach, LaFourche Parish. For some years, a rather simple beach protection technique was in use on Fourchon Beach (part of the Caminada Beach system just north of Grand Isle). Aggregate filled fibrous containers (that look like pillows and are called boudin bags [because they look like “boudin,” a Cajun sausage]) were placed along the beach. These have an apron of material (called ergomat) that extends toward the Gulf to keep waves from washing under the pillows and collapsing them.

It appears that this system helped (except that Hurricane Andrew washed many of them away), but the island continued to narrow, causing tremendous concern since Fouchon’s developed area (behind the barrier island) is the epicenter of activity for offshore oil and gas production.

Fouchon after Hurricane Andrew. Note the disarray of the boudin bags and absence of a beach.
To resolve the problem, Fouchon implemented a new system in 1994 that was patterned after a successful project on East Island ( Isle Dernier). A 10 ft high rectangular ring-levee, fronting along the foreshore where the boudin bags reside, was constructed and filled with pump sand. This elevated beach is less susceptible to the ravages of wave action on the beach face and the barrier beach seems to have been saved (at least for the time being).

Boudin bags, ergomat, and breakers at Fouchon.

Fouchon barrier island after it was leveed and filled, 1994.

The front of Fouchon barrier island with boudin bags and ergomat.

Healthy vegetation behind the refurbished Fouchon barrier island development.
B. Plantings and Fencing - The best techniques to stabilize barrier islands are those that mimic and help nature. Planting naturally occurring species of plants on beaches and low dunes gives Mother Nature a boost. The plants' roots hold the dunes together and the vegetative part of the plants "catch" the blowing sand and cause dunes to build.

After a storm, dunes are often partially washed away, revealing the extensive root systems that hold them in place (sea oats on Horn Island).

A dune starts with a few plants (sea oats). The wind blowing the leaves that touch the sand leaves “sand circles.”

In this photo, a few plants on the Grand Isle beach are capturing wind blown sand and starting a sand dune.

Planting projects, in conjunction with fencing, have been successful.

Fouchon beach with plantings on dunes and fencing.
In sea oats, for example, the plants grow "up" as wind-blown sand collects around their bases (see Horn Island photo above). This is an unusual trait and is the reason that only a few species of plants are successful growing on and among sand dunes (others get covered and die). The importance of the sea oats for dune stability (and thus allowing beaches to protect valuable wetlands to the rear) is why all coastal states have laws preventing people from collecting the beautiful seed heads of sea oats. If the seed heads are taken away for ornaments, new sea oats don't grow and the dunes quickly disappear. The following photo explains why people are always tempted to pick sea oats seeds – they are lovely.

Navarre , FL.
Be careful the next time you visit your favorite beach. Just walking over the dunes causes them to erode. If you go to a beach house, use (or make) movable “steps” that protect the dunes. They can be stored when no one is at the house.

It is also very effective to place fences (picket, wire, cloth, plastic sheet) and other such things (Christmas trees, bales of hay, etc.) on the beach. They catch wind-blown sand and promote the formation of dunes.

C. Beach nourishment (called soft engineering) - This is where sand is pumped onto the beach area, either from existing offshore sand deposits or after being barged in. This is very expensive. After Hurricane Juan, the Corps of Engineers spent $6 million nourishing Grand Isle's beach (again!).
There is now a proposal to mine sand from offshore deposits to be used to nourish beaches. This should be plenty controversial, but has potential.

Sand is being pumped from offshore (at taxpayers’ expense) to replace an eroded beach that resulted from poor placement of a jetty. Gulf Shores, AL.

A closer view. The birds love the free meal.
If it is totally lost, sand can be shipped in from other regions.

Sand delivered by dump trucks (at taxpayers’ expense) to replace dunes washed away in a hurricane ( Navarre, FL).
Both of these are very expensive processes and should be carefully considered before being attempted.
D. Breakwaters and other Hard Engineering that works - Where harsh wave action is destroying barrier islands, many projects have used boulders and other forms of rip rap to protect the shore. Breakwaters are structures (or piles of rocks) placed offshore that break the wave energy as it approaches shore.

Fouchon , LA.

Grand Isle, LA.
There is much work going on now regarding the use of automobile tires, old cars, etc. A local engineering firm is using a technique whereby they place tires (cut in half) in stacks that they say optimize the collection of moving sands in the water. Some say that this system changes the longshore movement of water and does little good for the beach.
Another local engineer developed a concrete "donut" that can be placed in shallow water where it is said to capture moving sand. These have been used on the north shore of Lake Pontchartrain at Fountainbleau State Park and were being used in 1992 to test their feasibility for stabilizing barrier islands (funded by Freeport McMoRan). Beach experts at UNO do not believe that these donuts are effective.



---Potential problems: Discussed in text above.
Rule of thumb: Barrier islands are and will always be dynamic, moving elements of our coast. This gradual movement is part of the natural order of geologic processes and cannot be controlled.
Dilemma: Barrier islands are very important as boundaries of lagoons and estuaries, yet people's use for houses, roads, etc., on these dynamic structures is hastening their loss. Anyone who builds a structure on any piece of land surely doesn't want to see the land move away and leave the structure in the water!
Future: The eustatic rise in sea level will eventually submerge the barrier islands. This is geologically cyclic. Our barrier islands are only several thousands of years old now (some are only 300 years old) and have come and gone in the past.
12. Marsh management (now called hydrologic restoration)
Although a great deal humans do in the marsh can be labeled management, the term marsh management refers to a particular school of thought on how to maintain wetland quality. It is embraced widely by landowners. The techniques used depend of the management objective: to save marsh, maintain wildlife, preserve and use mineral and/or property rights, define property lines, protect liability, protect vegetation, etc.
Several techniques are used for marsh management:
A. Impoundment: an enclosed parcel of land or water, called fastlands. Biologically speaking, impoundments are believed to reduce saltwater intrusion, reduce landloss, improve fish and wildlife habitats, enhance vegetation, and keep marsh from drying and soil from cracking. Some types of water control structures that are used in impoundments are:
-levees: Keep marsh water impounded.
-earthen plugs: Prevent water flow through canals and other openings.

-weirs: Designed to maintain water level in the marsh behind them. Most are 6 inches below average marsh level. If water level drops in the marsh, the soil behind the weir remains wet. There are several types:
-fixed-crest weir: These are rigid structures with the top fixed at a certain level, i.e., it cannot be adjusted.

-variable-crest weir: These are adjustable, usually with boards that can be removed or added.

-slotted weirs: This is a relatively new development. This type of weir has vertical openings that allow marine critters to move through even when the functioning weir is regulating the flow of most of the water.

-flap gates: Allow the water to flow only one direction. Freshwater can flow out, but saltwater cannot enter less salty marsh.

Photo by Richard Carriere
Note: If improperly designed or managed, impoundments may submerge marsh grasses and kill them, converting marshes to open water. It is frequently advisable, also, to drop the level of the marsh to encourage reseeding of marsh plants.
B. Canal back-filling: filling in old canals to stop their disruption of the marsh ecosystem.

C. Shoreline stabilization: using anything from plastic sheeting to rocks to protect shorelines from the destructive forces of waves and other water movements. In St. Charles Parish, a system of interconnected concrete blocks (called ergomat) was used to stabilize the mouth of a pipeline canal where it emptied into Lake Pontchartrain.

- Wave dampening fences : These are fences, made of many different materials, that are strategically placed in places where waves (caused by winds or even boat wakes) are causing damage to an area. In some cases it may be a bank, a marsh, or a swamp that is being protected.

E. Marsh burning: enhances new vegetation growth and nutrient recycling. In some instances, marsh fires destroy biomass needed for marsh building, but these events are unusual.

F. Aquatic weed control: prevents dominance by a few species. This has been done using machines that chop up the vegetation and throw it on the bank and using herbicides that kill the plants.
A novel approach has been the use of insects. In the 1960s, the Corps of Engineers introduced the Alligatorweed Flea Beetle into the St. Johns River in Florida. This beetle bores into the stem of the alligatorweed plant and kills it. They have spread throughout the South and, by killing alligatorweed and other freshwater marsh plants, have participated in the loss of incredibly rich habitat for alligators, fur bearers, and waterfowl.

Alligator Weed Flea Beetle.

Alligator weed eaten up by Alligator Weed Flea Beetle .
In the mid-1970s, the Louisiana Department of Wildlife and Fisheries introduced the Hyacinth Weevil, a native of South America, into the Atchafalaya River basin. This weevil feeds on the leaves (evidenced by little yellow spots) and stresses the plants enough that they do not flower. The flowerless plants produce no seed, but they still reproduce by forming daughter plants (asexual). Also, hyacinth seeds remain viable for 20 years or more, so there are constantly more plants showing up.

A water hyacinth choked bayou.

Water hyacinth that has been attacked by the Hyacinth Weevils. Note the tiny brown dots on the leaves.
G. Revegetation: actual planting of new vegetation where it has disappeared.

Milton Cambre and his plantings in the LaBranche Wetlands.

Grass plantings on a barrier island. Intended to stabilize the sand.
H. Use of old pipelines: Dr. Paul Kemp, formerly of the Coalition to Restore Coastal Louisiana, originally suggested that the network of abandoned pipelines extant in the marshes could be used to pump sediment to critical spots. This is presently being studied.
I. Wildlife control: Muskrats, and especially nutria, can eat vegetation faster than it can either grow or be planted. During the spring and summer, these rodents eat the base of the vegetative portion of the grasses, allowing the tops to float away. During winter, they eat the roots with much more devastating results. During the winter, geese can have very negative impact on large growths of marsh. They also eat the roots. Nutria are especially fond of seedling cypress. In order to protect new plantings, ecologists are using various products (called NEDs, Nutria Excluder Devices, a take-off on TEDs, Turtle Excluder Devices) to protect the seedlings (such as plastic sheaths [these seem to work best], wire sheaths, and exclosure fences).

An excellent idea, originally pushed by the Louisiana Nature Center in New Orleans, is to eat nutria. The first two NutriaFests were held in 1993 and 1994 at the Louisiana Nature Center during which there is a nutria cook-off (this was continued at the Swamp Fest at the Audubon Zoo and returned to the Louisiana Nature Center in 1998). It is quite tasty and leaner than turkey.

Enjoying nutria (cooked by Art Cormier, left) for a National Geographic Explorer video.
NutriaFest also advocates redeveloping a nutria fur industry for everyday winter wear. This full length nutria coat was purchased at Saks 5 th Avenue, and is elegant and warm (and helps rid out coastal wetlands of nutria).

---Potential problems: Negative impacts of the use of levees in marsh management include their exclusion of some vegetation, fish and/or wildlife; changing of natural water movement; and restricting movements of some marine organisms. Many believe that the latter is the most important negative.
13. Mitigation banking. This program derives its name from the way we use banks. When we want to save money, we place our money in one place - our bank. A mitigation bank is a designated place where someone can invest money to improve the quality of wetlands. This happens when someone wants to in some way change a wetlands (drain, fill, change the vegetation, dredge) in order to accomplish some project. If the project is deemed important enough, and the affected wetlands are deemed unimportant enough, the project may be approved with the qualification that another wetland be improved. Normally, a "deposit" is made in a mitigation bank. The largest and oldest in the Mississippi River Delta is the Fina-LaTerre Mitigation Bank south of Houma. Someday that very important wetland area will be fully functional and yet another mitigation bank will have to be formed. There are many places where mitigation banks will remediate problems in our coastal wetlands, and we must assure that they are chosen wisely for the good of the entire ecosystem.
---Potential problems: People who oppose the concept of mitigation banking fear that the wide-spread and acceptable use of this program will make permitting agencies more lenient with requests to alter wetlands.
14. Removing Nutria. As has been discussed in 12I above, nutria have had a devastating impact on coastal wetlands. Since this is an alien species (from Argentina), there is no biological reason to protect it. We should do everything we can to extirpate U.S. populations, including exporting meat, eating them ourselves, and wearing their skins. In 2002, a bounty of $4 was placed on nutria, with a target of eliminating 400,000.
---Potential problems: None!
SO WHAT CAN WE, AS INDIVIDUALS, DO?
The following are a few thoughts:
-Develop a sense of stewardship; encourage people to care for the land.
-Save what we can.
-Slow the process as well as we can then develop techniques for replacing the values of wetlands.
-Encourage technologies that replace wetland values, both economic and cultural.
-Do everything we can to get all public agencies involved in coastal wetlands to operate in a coordinated fashion.
In the marsh zone (below Belle Chasse, Houma, and Thibodaux), people live on the old natural ridges. There are two things we do to protect ourselves from saltwater invasion:
1. Build levees.
2. Install flood gates to hold back the intrusion of salt water. Canals give saltwater and floods new entries.
The way we have accomplished the above is through the implementation of development corridors. The classic is the stretch between Belle Chasse and Venice where the highway and living areas are protected by levees. Since high waters are prevented from spreading over the entire zone by the levees, this development corridor causes unusual flooding to the west.

Chauvin , LA , development corridor .
Consider ethical questions: If it will take $5 billion to save $50 million in economic value, should we do it?
We will have to learn to live differently. We will be forced to make decisions that we have always put off before. For example, we may well have to displace Morgan City or New Orleans. We may not be able to save Grand Isle. People who live in many coastal areas may have to be denied subsidized flood insurance. We may be forced to change the main channel of the Mississippi.
What if we do lose the fisheries? What then? If the worst case scenario does occur, what will the displaced people do? In terms of this looming catastrophe, is New Orleans worth saving? Cut Off? Grand Isle? South Louisiana? Do we have the will to solve these problems?
After all this discussion, there are three truths:
1. There will always be a coastline.
2. There will always be a mouth to the river.
3. Our wetlands will never be restored to what they were. In fact, we will not restore the disappearing saline marshes. They will be open, shallow bays with islands of grass.
Dr. Woody Gagliano (1994) offers some suggested steps to help save the coastal wetlands:
1. Save the ridges - the high ground. This is also true for the barrier islands.
2. We must establish a line of defense where we try to stop the loss. These places may be identified as where the loss is now occurring.
3. We should establish some new oyster reefs that will add grit to the system so that beaches can be made. They will also operate as breakwaters.
4. Expand the delta in critical plumbing zones.
a. Balize - spread soil over the adjacent shelf.
b. Atchafalaya - allow sediment to exit Wax Lake Outlet.
5. Build Davis Pond freshwater diversion canal.
6. Maintain the banks of the waterways (GIWW, Barataria Navigational Canal, Houma Navigational Canal, MRGO, etc.).
7. Use dedicated dredging. Move the dredged soil through pipelines to critical places in the marsh (using existing and new pipelines).
|